Home Latest News All future CPEC Projects should imitate Thar Coal model of inclusive development: Senator Mushahid Hussain
Latest News - November 3, 2019

All future CPEC Projects should imitate Thar Coal model of inclusive development: Senator Mushahid Hussain

A delegation of senior parliamentarians headed by Senator Mushahid Hussain Sayed advised that all developmental projects under CPEC should follow Thar's inclusive development model which promotes the Public-Private Partnership (PPP) venture. Visiting Thar Coal Block II, Chairman Pakistan-China Institute (PCI) and Senator said all upcoming CPEC projects should follow the strategy of the Thar Coal project which endorses PPP venture. The members of the delegation were briefed by Chief Executive Officer of Engro Energy Limited, Ahsan Zafar Syed and Sindh Engro Coal Mining and Thar Foundation CEO, Syed Abul Fazal Rizvi on the mining status which has reached to 180 meters depth so far. Current production capability of mine is 12,000 tons of coal per day while the power plant is generating 660 MW of electricity. On occasion, Senator Krishan Kolhi stated that Thar's inclusive developmental model would ultimately change the face of the whole country after changing the lives of local residents in Thar.

SUKKUR: A delegation of senior parliamentarians, led by Senator Mushahid Hussain Sayed on Saturday, urged all the mega development projects, including CPEC should replicate Thar’s inclusive development model, being executed under the Public-Private Partnership venture.

While talking to media persons during a daylong visit to Thar Coal Block-II mining site, Mushahid, who also heads the Pak-China Institute, said Thar’s development model should be replicated across Pakistan for future projects. He said his forum will surely advocate and take up Thar’s development model as a replica, adding that the Thar Coal Block-II project plan is properly being executed through the Public-Private Partnership regime.

The delegation was briefed by the Chief Executive Officer of Engro Energy Limited, Ahsan Zafar Syed and Sindh Engro Coal Mining and Thar Foundation CEO, Syed Abul Fazal Rizvi, regarding up-to-date mining status. He added currently the production of Thar coal had reached 12,000 tons of coal per day, while power plant is generating 660MWs as per the indent.

Senator Krishan Kolhi, who belongs to Thar, said the Thar development model will change Pakistan’s face after changing the lives of local people. She said the women empowerment programs introduced by Thar Foundation is also an unmatched approach to resolve feminine issues. The delegation comprised senators Nauman Wazir, Sikandar Mendhro, Lt. Gen Abdul Qayyum, Rukhsana Zubairi, Krishan Kolhi, MNA Dr Sherza Kharal and Special Assistant to Chief Minister on Human Rights, Veerji Kolhi and others.

Leave a Reply

Your email address will not be published. Required fields are marked *

Check Also

CPEC’s Success Story: $25 Billion Invested Across 38 Completed Projects

ISLAMABAD: A total of 38 projects worth over $25 billion have been completed and 23 develo…